Completed project
Private Villa Overflow Swimming Pool – Hisban, Jordan
Hisban · 2021 · 6 × 12 m overflow pool
PROJECT OVERVIEW
The project, from brief to delivery.
Kingdom Pillars delivered the complete construction of this private villa swimming pool in Hisban, Jordan, in 2021. The project included a 6 × 12 m overflow swimming pool with an integrated terrace and bathroom facilities. It was delivered as a complete turnkey solution, with the principal civil and mechanical stages managed and implemented by our team.
Scope of work
- Site preparation and excavation
- Complete civil and structural works
- Overflow swimming pool construction
- Waterproofing works
- Pool tiling and finishing
- Overflow and balance-tank system
- Complete filtration and circulation system
- Pool mechanical installations
- Terrace construction
- Bathroom facilities
- Testing, commissioning and final handover
DELIVERY JOURNEY
How the project came together.
- 01
Site preparation & structure
Excavation, preparation and complete civil and structural works for the pool.
- 02
Waterproofing & finishing
Waterproofing, pool tiling and the detailed finishing of the overflow edges.
- 03
Mechanical systems
Installation of the balance tank, circulation, filtration and pool mechanical systems.
- 04
Terrace & facilities
Construction and coordination of the surrounding terrace and bathroom facilities.
- 05
Testing & handover
System testing, commissioning and final project handover.