Completed project · Dabouq, Amman, Jordan
Renovation of two existing swimming pools within a residential compound in Dabouq, Amman. Each pool measures approximately 4 × 10 m. The works included removal of the existing finishes, new plastering, a complete MAPEI waterproofing system, new pool tiling, modifications to the mechanical rooms, and waterproofing of the pool tanks.
View case study
Completed project · Dabouq, Amman, Jordan
A private villa renovation project in Dabouq, Jordan, completed in 2023. The existing swimming pool was stripped back to the structural shell and fully rehabilitated with new plastering, waterproofing and tiling works. The project also included the construction of a new steam room and a new sauna.
View case study
Completed project · Jerash, Jordan
A private villa leisure project in Jerash, Jordan, completed in 2023, featuring an 8 × 4 m overflow swimming pool, a 2.5 × 2.5 m jacuzzi and a 1.7 × 2.5 m sauna. The project also included dedicated heat-pump systems and salt chlorination systems for both the swimming pool and the jacuzzi.
View case study
Completed project · Naour, Jordan
A comprehensive private villa renovation and development project in Naour, combining the renovation of the existing residence with the construction of a new overflow swimming pool, terraces, rainwater collection tank, storage facilities, bathrooms and outdoor seating areas.
View case study
Completed project · Al-Asha, Irbid, Jordan
Irbid · 2020 · 8 × 18 m pool and Jacuzzi
View case study
Completed project · Hisban, Jordan
Hisban · 2021 · 6 × 12 m overflow pool
View case study